News

Miniature Deep Groove Ball Bearing Heating Considerations

2020-05-14

1, place the yoke iron on the end surface of the host.

2, will plug into the power socket on the control switch.

3, check that the ground wire is good, use pencil test after power on.

4, press the Start button, the host has power.

5, check the yoke iron should be no voltage to ground.

Host power 6, press the stop button to stop heating.

7, depending on the size of miniature bearings or other parts, select a different on the yoke iron, this put the yoke iron on the top surface of the host, should fit flat.

8, heated micro-bearings, sensors should be inserted "sensing socket" and close to the heated sensor artifacts.